portakabin remove and reinstall foundations

Jackpad® has been designed specifically for recovery and reuse, making it an ideal choice for modular buildings that are installed temporarily or relocated during their service life. However, moving a reusable foundation system is not simply a case of removing the existing units and recreating the same arrangement elsewhere.

In simple terms, the process involves recovering and checking the existing foundations, assessing the new site, determining the appropriate configuration and reinstalling the system where necessary.

Can Jackpad Foundations Be Reused at a New Site?

Reusable Jackpad® foundation systems can be recovered following installation, inspected and prepared for deployment on another suitable project. However, they should not simply be collected and re-installed at a new site without some amendments.

Each new installation therefore needs to be assessed against the conditions and structural requirements of its specific location. This is because any changes in ground conditions, levels, building loads or modular configuration can affect the foundation requirements.

What Needs to Happen Before Jackpad Is Removed?

Foundation removal should be considered within the wider programme for dismantling and relocating the modular building. The building supplier, contractors and Jackpad® team should coordinate activities to ensure the foundations are safely accessed and recovered at the appropriate stage.

Ownership arrangements should also be confirmed, as hired and purchased Jackpad® systems are subject to different procedures following removal. Responsibility for lifting, dismantling and transporting the modular building should be clearly defined and managed by the appropriate project teams.

How Jackpad Foundation Removal Works

Once the modular building has been dismantled or moved and the foundations are accessible, the Jackpad® units can be recovered from the site.

For hired systems, Jackpad® arranges collection and returns the units to its base. They can then be cleaned, inspected and restored where necessary before being prepared for another suitable installation.

Purchased units remain under the ownership of the customer and may be available for future use, subject to their condition and the requirements of the next project.

To learn more about the advantages of each approach, explore our guide about whether you should hire or buy Jackpad® foundations.

What Should Be Checked Before the Foundations Are Reused?

Recovered foundation components should be inspected before being returned to service to verify their condition and suitability for reuse. Jackpad® units are assessed after recovery and, depending on their condition, may require cleaning, maintenance or restoration before being prepared for a subsequent installation.

The requirements of the new project must also be reviewed to ensure the recovered components are compatible with the proposed foundation arrangement and capable of supporting the building and site loads.

As an option, reuse tends to depend on both current condition and future suitability.

Why the New Site Must Be Assessed Again

Relocating the same modular building does not mean that its previous foundation design can automatically be used at the new location.

The new site may have different ground-bearing capacity, levels, access conditions or other characteristics that affect the foundation design. The condition and features of the building itself must also be considered. Aspects like its weight and loads, arrangement of modules, number of storeys and the way those loads are transferred through the foundation system must all be considered.

A site survey helps identify the conditions relevant to the proposed installation. Project-specific calculations can then determine the appropriate number and configuration of Jackpad® units, rather than assuming that the previous amount will be sufficient again.

How Jackpad Is Reconfigured and Reinstalled at the New Location

Reinstallation is essentially treated as a brand-new process and will be designed around the requirements of each new project rather than replicating the previous foundation layout.

Following site assessment and all appropriate calculations, Jackpad® foundation relocations are configured to suit the building arrangement, ground conditions and required load distribution.

These reusable foundation systems are positioned and levelled before installation, with ±2mm adjustment accommodating ground variations. Where suitable ground-bearing capacity exists, little or no ground preparation may be required. All of these benefits allow you to reuse Jackpad® foundations on future projects again and again.

Why Reusable Foundation Systems Suit Relocatable Buildings

Relocatable modular buildings can benefit from foundation systems designed to adapt to changing project needs. Jackpad® units, manufactured using recycled plastic and steel, can be recovered and reused on suitable future installations.

This can reduce the need for new foundations following relocation, while limiting breaking out, removal and ground remediation associated with permanent concrete foundations.

The approach of Jackpad® foundation removal provides a flexible, reusable foundation pad solution that complements the adaptable nature of modular buildings.

Hire vs Purchase When You Expect to Relocate a Modular Building

There is no exact binary answer when looking into hiring or buying reusable foundation systems like Jackpad®.

When hiring, the units can be collected when the installation is no longer needed and returned for inspection, restoration and preparation.

Purchasing gives the customer total freedom over whether or not redeployment is necessary for future projects. Redeployment remains an option following inspection and confirmation that the units meet the requirements of the new project.

The most suitable option will depend on the expected duration of the project, future relocation plans and how the system may be used across subsequent installations.

Planning a Modular Building Relocation with Jackpad

For the best results, reusable foundation pads and systems should be incorporated into the future relocation plans from the very outset. Providing Jackpad® with details of the new site, building and proposed programme will enable appropriate assessment, calculations, configuration, logistics and installation planning.

Arrange a site survey today to ensure the foundation arrangement is up to standard for your project or contact the Jackpad® team today, by calling 0116 286 6966 or by emailing enquiries@jackpad.co.uk.