Here at Jackpad®, we previously held LABC Registered Details accreditation, but this scheme is no longer the route being used for new and upcoming projects. Today, compliance depends on the building itself, current Building Regulations, technical evidence and the correct Building Control route. This blog post has been written to explain what this means regarding modular building foundations.
What Happened to the LABC Registered Details Scheme?
The LABC Registered Details scheme allowed both products and systems to undergo technical assessments, helping Building Control analysis teams to review previously assessed details.
For 17 years, Jackpad® participated in this scheme, but no longer. LABC closed the product registration scheme in 2021, but this status is not redundant. Instead, it demonstrates a long-established history of independent scrutiny on our products, rather than providing current approval for new projects.
What Is Required for Modular Building Projects Now?
Modular buildings must meet the applicable Building Regulations just like other forms of construction.
For most projects in England outside the higher-risk building regime, Building Control is managed by either a local authority or registered building control approver. Higher-risk buildings follow a different route involving the Building Safety Regulator.
Clients, designers and contractors also have responsibilities to plan, manage and carry out compliant work, with suitably competent people or organisations appointed to each role.
What Does Building Control Need to See from a Foundation System?
Building Control requires evidence that the foundation system is suitable for the specific project. This may include structural calculations, verified load capacities, ground-bearing information, installation requirements and relevant testing.
Each Jackpad® modular foundation system must be assessed in relation to building loads, storeys, ground conditions, site levels and load paths. There isn’t a single certificate, calculation or test that can demonstrate complete project compliance; suitability must be established for each individual installation.
How the Current Rules Change What Specifiers Should Ask Suppliers
At the quotation and design stage, ask whether the foundation supplier can provide:
- Current technical data
- Project-specific calculations
- Independently tested safe working loads
- Ground-bearing requirements
- Installation information
- Relevant testing evidence
- Clear information for designers, contractors and Building Control

How Jackpad Supports Current Modular Building Compliance
Once access, levelling and general ground conditions have been determined, Jackpad® can deliver and install the required foundation configuration for your modular building project. Project-specific calculations establish both the number and general arrangement needed. The system has independently tested safe working load ratings and can support certain modular installations up to three storeys high.
Jackpad® can provide technical documentation and installation support across a wide range of modular building sectors, while Building Control approval remains with the relevant authority.
Where Does Jackpad’s Former LABC Accreditation Fit Today?
Jackpad®’s 17 years of LABC Registered Details accreditation remain perfectly relevant as part of our extensive product history and previous independent scrutiny.
However, you should be aware that new projects still require current technical evidence and project-specific assessment. Historic accreditation supports the system’s track record, but it does not replace today’s Building Control process.
Does Your Modular Building Need Building Control Approval?
Many modular buildings require Building Regulations approval, depending on factors like their proposed use, chosen location, potential duration and any other applicable exemptions. Temporary or short-term use does not automatically mean a project is exempt either.
Confirming the correct approval route early helps ensure foundation requirements, supporting information and structural calculations are incorporated into the design from the outset, rather than addressed after installation.
Choosing a Modular Foundation System Under the Current Regime
Foundation systems should be selected based on current technical evidence, structural requirements, site conditions and the specific expectations of the relevant Building Control body.
Jackpad® brings together an established track record with up-to-date technical data, project-specific site surveys, structural calculations and installation support.
For further information, you can also explore how the Jackpad® system can be used to support long-term modular building installations and their changing foundation requirements, while ensuring they meet modern modular construction standards.
To discuss your upcoming project, get in touch with the Jackpad® team, call 0116 286 6966 or email enquiries@jackpad.co.uk.